Michelle
South Island ▷ Marlborough ▷ Blenheim ▷
2.0/5
I only saw the pitches as when we arrived there was construction work going on around the roads beside it and the bridge area within it.
This loud works goes from 7:30am until 6pm, which is okay if your out all day but even when you return your surrounded by construction work.
They offered us a refund as we decided not to stay after 10 mins because it was so noisy.
Other facilities looked ok but did not use them.
Hard to get in or out of the road as very busy junction.